![GB 50372-2006 炼铁机械设备工程安装验收规范 (英文版)](https://wfqqreader-1252317822.image.myqcloud.com/cover/796/33688796/b_33688796.jpg)
5.7 Installation of Frame
Ⅰ Dominant Items
5.7.1 The deformation and peeling of paint on steel element due to handling,piling and hoisting shall be corrected and repaired.
Check quantity:10% random check for elements and at least 4 pieces.
Check method:observe or pull line and check with a steel rule.
Ⅱ General Items
5.7.2 The allowable installation deviation of top rigid frame and frame shall meet the requirements in Table 5.7.2.
Check quantity:full check.
Check method:see Table 5.7.2.
Table 5.7.2 The allowable installation deviation of rigid frame and frame(mm)
![img](https://epubservercos.yuewen.com/E66905/18000634601100806/epubprivate/OEBPS/Images/txt005_13.jpg?sign=1738980773-WxdXVPSzvniFcTU7StdKHqwOYooUy18k-0-e22ee362a1498a0f71e17c638bb5c506)
Note:H refers to column height.
5.7.3 The allowable installation deviation of supports for top equipment shall meet the requirements in Table 5.7.3.
Check quantity:full check.
Check method:see Table 5.7.3.
Table 5.7.3 Allowable installation deviation of supports for top equipment(mm)
![img](https://epubservercos.yuewen.com/E66905/18000634601100806/epubprivate/OEBPS/Images/txt005_14.jpg?sign=1738980773-u8fONndA99v9kWJcOZU9flSLeqAtORaE-0-d53f7ac0f070336ac44ae37d7a8c3107)